PHASE 2 · QUALITY ASSURANCE SYSTEM
Application Supervision
A coating fails at application far more often than in the can. Our supervisors stay on site so every square metre performs as specified.
What the service covers
Beyond the supply contract, ARY Kavach places trained application supervisors on your project. They verify surface preparation, control mixing ratios and pot life, check ambient conditions, and sign off each coat before the next goes on — ensuring performance through proper application.
The service is included with turnkey projects and available standalone for departmental or contractor-applied work.

How it runs on site
STEP 1
Surface sign-off
Prep verified against the site-audit findings before any material opens.
STEP 2
Controlled mixing
Ratios, induction time and pot life managed batch by batch.
STEP 3
Coat-by-coat checks
Wet film thickness and recoat windows checked on every pass.
STEP 4
Handover report
Documented record feeding Phase 3 performance inspection.
Benefits
Full rated service life
The system achieves the durability it was engineered for.
No disputed failures
Documented application removes ambiguity between supplier and applicator.
Lower lifecycle cost
Fewer repaints and repairs across the maintenance horizon.
Industries served
- Bridges & Infrastructure
- Railways
- Hospitals & Institutions
- Public Housing
- Water Infrastructure
- Industrial & PSU Facilities
Related products
Put a supervisor on your next project.
Share your site details and we'll scope the supervision plan within two working days.


