Skip to main content
KAVACH COATINGSINDIA PVT. LTD.

PHASE 2 · QUALITY ASSURANCE SYSTEM

Application Supervision

A coating fails at application far more often than in the can. Our supervisors stay on site so every square metre performs as specified.

What the service covers

Beyond the supply contract, ARY Kavach places trained application supervisors on your project. They verify surface preparation, control mixing ratios and pot life, check ambient conditions, and sign off each coat before the next goes on — ensuring performance through proper application.

The service is included with turnkey projects and available standalone for departmental or contractor-applied work.

Supervised roller application of a protective coating

How it runs on site

  1. STEP 1

    Surface sign-off

    Prep verified against the site-audit findings before any material opens.

  2. STEP 2

    Controlled mixing

    Ratios, induction time and pot life managed batch by batch.

  3. STEP 3

    Coat-by-coat checks

    Wet film thickness and recoat windows checked on every pass.

  4. STEP 4

    Handover report

    Documented record feeding Phase 3 performance inspection.

Benefits

  • Full rated service life

    The system achieves the durability it was engineered for.

  • No disputed failures

    Documented application removes ambiguity between supplier and applicator.

  • Lower lifecycle cost

    Fewer repaints and repairs across the maintenance horizon.

Industries served

  • Bridges & Infrastructure
  • Railways
  • Hospitals & Institutions
  • Public Housing
  • Water Infrastructure
  • Industrial & PSU Facilities

Put a supervisor on your next project.

Share your site details and we'll scope the supervision plan within two working days.