Skip to main content
KAVACH COATINGSINDIA PVT. LTD.

PHASE 1 · QUALITY ASSURANCE SYSTEM

Site Audit

The wrong specification cannot be fixed with good application. We assess what is actually on the surface before a single litre is quoted.

What the service covers

Before ARY Kavach specifies a coating, our team surveys the asset: substrate type and condition, moisture content, existing coating adhesion and chalking, corrosion extent, and the structural and drainage issues that will shorten the life of any system laid over them.

The audit produces a written finding and a recommended system — including the surface preparation the finding requires. It is the reference every later phase is checked against.

Surface assessment being carried out on site

How it runs on site

  1. STEP 1

    Asset walkover

    The full extent is surveyed and the areas in scope are recorded.

  2. STEP 2

    Substrate diagnosis

    Moisture, adhesion, chalking and corrosion measured, not estimated.

  3. STEP 3

    System recommendation

    A coating system matched to the findings, the climate and the duty cycle.

  4. STEP 4

    Written finding

    The documented baseline that Phase 2 signs surface preparation against.

Benefits

  • Right system, first time

    The specification answers the actual condition of the asset.

  • No surprises on site

    Preparation work is known and priced before mobilisation.

  • A defensible baseline

    Documented condition supports the tender file and later inspection.

Industries served

  • Bridges & Infrastructure
  • Railways
  • Hospitals & Institutions
  • Public Housing
  • Water Infrastructure
  • Industrial & PSU Facilities

Book a site audit for your asset.

Share the location and approximate area and we will schedule a survey.