PHASE 1 · QUALITY ASSURANCE SYSTEM
Site Audit
The wrong specification cannot be fixed with good application. We assess what is actually on the surface before a single litre is quoted.
What the service covers
Before ARY Kavach specifies a coating, our team surveys the asset: substrate type and condition, moisture content, existing coating adhesion and chalking, corrosion extent, and the structural and drainage issues that will shorten the life of any system laid over them.
The audit produces a written finding and a recommended system — including the surface preparation the finding requires. It is the reference every later phase is checked against.

How it runs on site
STEP 1
Asset walkover
The full extent is surveyed and the areas in scope are recorded.
STEP 2
Substrate diagnosis
Moisture, adhesion, chalking and corrosion measured, not estimated.
STEP 3
System recommendation
A coating system matched to the findings, the climate and the duty cycle.
STEP 4
Written finding
The documented baseline that Phase 2 signs surface preparation against.
Benefits
Right system, first time
The specification answers the actual condition of the asset.
No surprises on site
Preparation work is known and priced before mobilisation.
A defensible baseline
Documented condition supports the tender file and later inspection.
Industries served
- Bridges & Infrastructure
- Railways
- Hospitals & Institutions
- Public Housing
- Water Infrastructure
- Industrial & PSU Facilities
Related products
Book a site audit for your asset.
Share the location and approximate area and we will schedule a survey.


